2012 Dassault Falcon 2000LX
Used
Call for price
Registration no. N881JHSerial no. 192
20 VIEWS
76 DAYS ON FLYING
0 SAVES
Highlights
- Preferred 10 Passenger Configuration
- Fresh 12 Month Inspection - Dec 2022
- 2C Inspection & Gear Overhaul – Nov 2021
- Gogo AVANCE L5
- EASy II Next Gen Upgrades:
Cert 4 w/ Push-to-Load & Fast Chart Database Loading
SmartView Synthetic Vision System (SVS)
CPDLC with FANS 1/A & ATN-B1
Enhanced Nav with WAAS-LPV
Dual Jeppesen Charts
XM Graphical Weather
- Upgraded 88 Parameter FDR
- Engines Enrolled on ESP Platinum
- APU Enrolled on Honeywell MSP Gold
- FlightDocs Maintenance Tracking Program
Seller location
Annapolis, Maryland, United States
Aircraft location
United States
Airframe & Propulsion
Airframe Total time
3926 hours
Airframe Description
TTAF: 3926
Landings: 2832
Engine 1 hours
3879 hours SNEW
Engine 2 hours
3879 hours SNEW
Propulsion
Pratt & Whitney PW308C
Engine 1: S/N PCE-CF0418
3879 HSN, 2788 CSN
Engine 2: S/N PCE-CF0419
3879 HSN, 2788 CSN
APU: Honeywell GTCP36-150(F2M) S/N P-555
27270 HSN
Avionics
Flight rules
Instrument Flight Rules
Navigation equipment
Honeywell Primus EPIC EASy II System
Honeywell EASy II Cert 4 Upgrade with Push-to-Load & Fast Chart Database Loading
Honeywell EASy IFCS Flight Director / Autopilot
Honeywell EASy II Automatic Descent Mode
Honeywell EASy Communication Management Function (CMF)
Collins HGS-4860 Head Up Display
CMS-2600 “SureSight” Enhanced Vision System
Synthetic Vision System
Triple Honeywell AV-900 Flight Deck Audio
Triple Honeywell TR-866 Comms
Dual Honeywell NV-875 Navs
Dual Honeywell DF-855 ADFs
Dual Honeywell DM-855 DMEs
Dual Honeywell XS-857 Transponders
Dual Honeywell EASy FMS
Dual Honeywell GPS
Triple Honeywell LASEREF V MIRU IRS
Dual Collins HF-9000 HFs w/SELCAL
Dual Honeywell RT-300 Radar Altimeter
XM Graphical Weather
Honeywell Primus 880 Color Weather Radar
Honeywell EASy EGPWS
Honeywell TCAS-3000 TCAS II w/Change 7.1
Honeywell SSCVR (120-Minute) Cockpit Voice Recorder
Honeywell SSFDR (88-Parameters) Flight Data Recorder
ELTA ADT-406 ELT
Additional equipment
Next Gen Upgrades
Enhanced Avionics System, EASy II 4th Cert (SB F2000EX-450)
Cert 4 Fast Chart Database Loading (SB F2000EX-452)
Cert 4 Push-to-Load Function (SB F2000EX-453)
Enhanced Nav with WAAS-LPV (SB F2000EX-301)
ADS-B Out (SB F2000EX-302)
SmartView Synthetic Vision System – SVS (SB F2000EX-303)
Dual Jeppesen Electronic Charts (SB F2000EX-305)
XM Graphical Weather (SB F2000EX-306)
CPDLC with FANS 1/A (SB F2000EX-308 & -309)
VDR 3 Module Capable of ATN/VDL Mode 2 (SB F2000EX-310)
Third Crew Member Seat
Meggitt Mark II Secondary Flight Display
FalconBroadcast
CTS Quick Access Recorder
115 Cu. Ft. Oxygen Bottle
High Temp Oven
Microwave
Coffee Maker
Interior & Exterior
Number of seats
10
Interior Condition
Interior by Duncan Aviation, Lincoln – September 2015
Ten (10) passenger configuration featuring a forward fully equipped galley. The cabin seating consists of a forward four (4) place
club followed by an aft four (4) place conference group opposite a two (2) place club. Aft passenger lavatory.
Connectivity
Gogo AVANCE L5
AirCell Axxess II Iridium w/DIU
Entertainment
Falcon Cabin Management System (FCMS)
Rockwell Collins Airshow 4000
Forward & Aft 20” LCD Bulkhead Monitors
8.4” Plug-In Monitors & Receptacles
Falcon Cabin Management System (PA/Chime, Lights, Temperature)
Interior Year
2015
Interior Score
9
Exterior Condition
Exterior by Duncan Aviation, Lincoln – September 2015
Overall Matterhorn White, Black Nacelles w/Gold & Black Accent Striping.
Paint Year
2015
Paint Score
8
Maintenance
Inspection Status
Engines on ESP Platinum
APU on Honeywell MSP Gold
FlightDocs Maintenance Tracking Program
Inspection Compliance Next Due
12 Mo / 800 hrs Dec. ‘22 / 3907 Hrs. 4707 Hrs.
24 Mo / 1600 hrs Nov. ‘21 / 3414 Hrs. 5014 Hrs.
36 Mo / 2400 hrs Nov. ‘21 / 3414 Hrs. 5814 Hrs.
12 Month Dec. ‘22 Dec. ‘23
24 Month Nov. ‘21 Nov. ‘23
36 Month Nov. ‘21 Nov. ‘24
1B (1600 hrs) 2594 Hrs. 4194 Hrs.
2B (3200 hrs) 3030 Hrs. 6240 Hrs.
3B (4800 hrs) N/A 4800 Hrs.
4B (6400 hrs) N/A 6400 Hrs.
2C (144 Mo / 7,500 ldgs) Nov. ‘21 Nov. ‘27
3C (216 Mo / 11,250 ldgs) Nov. ‘21 Nov. ‘33
3C (216 Mo / 11,250 ldgs) Nov. ‘09 Nov. ‘39
Supporting Materials
2000-192.pdf